CASE STUDY•Offshore Wind•REAL-TIME MONITORING

Crack Growth Monitoring (Siemens SWT 2.3, Scotland)

Crack Detected in 14 Days. Drone Confirmed It Five Months Later.

10

TURBINES MONITORED

Siemens SWT 2.3 fleet, Scotland

14 DAYS

INSTALLATION TO DETECTION

01

CHALLENGE & SOLUTION

THE CHALLENGE

Remote fleets share a common blind spot: damage develops between inspections and goes undetected. For these 10 Siemens SWT 2.3 turbines in Scotland, the next scheduled inspection was months away. A transverse crack forming at mid-span would have been invisible until it became costly — or catastrophic.

THE SOLUTION

Windrover was installed on 6 June 2025. Within 14 days its acoustic sensors flagged a CAT3–CAT4 signal consistent with a crack-type defect. No site visit. No drone. No guesswork — the anomaly surfaced from the blade's own acoustic signature, continuous and automatic, monitored from shore.

02

THE DAMAGE — DRONE INSPECTION FINDING, NOVEMBER 2025

  • WINDROVER DETECTED
    • CAT3–CAT4 Signal
    • Surface Gap or Opening
    • Suspected Crack-Type Damage
  • DRONE CONFIRMED
    • CAT3 Transverse Crack
    • Size: 69 × 12 cm
    • Location: Mid-Span

    5 months later. Exact match.

03

WHAT THIS MEANT FOR THE FLEET

Early Detection

A CAT3–CAT4 crack signal was raised 14 days after installation — five months before the next scheduled inspection would have found it.

No Unplanned Site Visit

The defect was identified, categorised, and flagged remotely. No technician dispatch was needed to discover the problem.

Intervention Before Escalation

Repair was planned with advance notice — before the crack progressed to CAT4–CAT5 and the decision became emergency, not maintenance.

04

HOW IT UNFOLDED

December 2024

Baseline Inspection

Turbines inspected. No damage found.

6 June 2025

Windrover Installed

24/7 acoustic monitoring begins across all 10 turbines.

20 June 2025

CAT3–CAT4 Signal Detected

Acoustic anomaly flagged — 14 days after install.

November 2025

Drone Confirms the Crack

69 × 12 cm transverse crack at mid-span. Prediction exact.

Blade damage doesn't wait for the next inspection. Windrover doesn't either.

Offshore operations demand precision.

Detect cracks early, plan repairs proactively, and keep turbines running.